Advanced Reports for AceProject using Bridge24

By |2018-09-21T16:02:56+00:00September 21st, 2018|

AceprojectBridge24 is now being used by more and more AceProject users to increase performance in task retrieval and editing, as well as to output information such as reports into excel or PDF. New features for AceProject users are now available from within Bridge24.

Bridge24 Advanced Reports

This week saw the introduction of Advanced Reports. Users can now prepare a 2 level report (grouping) and include up to 4 more fields in addition to the task name.  This easy to use report creation tool also allows you to export the report into a convenient PDF or Excel file, as well as others.

Advanced Reports for Asana & Trello

Configure and generate the report

Select the Second level grouping parameter and fields to include, then generate.

Aceproject advanced report

The report is created and the user can navigate directly and then export to the desired format such as PDF or Excel.

Aceproject advanced report2

Project Report: Status Delay

This report allows you to calculate the average and cumulative duration (in days) of tasks by project and by status. The user must specify input parameters, such as statuses, that are to be considered in the calculations. Access through Reports>Reports for Projects. A project or a filter containing 1 or several projects must be selected. A good use of this report is to find out how much cumulative time has passed for tasks leading up to being completed.

Project_status_report_AceProject

Custom Development

Do you require a custom report output or other need? We are able to accommodate through our Custom Development possibilities built in Bridge24.

Did you know? (What can an AceProject user do through Bridge24)

  • Bridge24 can be used to view and update tasks directly. It is like a new interface to interact with your tasks. Some users prefer this alternate interface and now work exclusively through Bridge24!
  • The flexible Grid mode allows you to change column positions, widths, and also allows grouping.
  • View your project as a Board and drag tasks from one column to another to change status.
  • Charts, Reports, History, and more!

For more information, check out Bridge24 for AceProject

Bridge24 Officially Recognized by Basecamp
Export Asana Data Easily With Bridge24 - An Interview with Todd Cavanaugh

About the Author:

Bridge24 Team
Bridge24 is a complimentary application to AceProject, Asana, Basecamp, and Trello that allows dynamic connectivity to your data which can be viewed and manipulated in ways not possible in the native application. Stay tuned for more exciting features on the way! Be sure to provide us your feedback about what you would like to see inside of Bridge24!